The Cabin on the Lake.

gotlost

Kap Chong R Us Member
We returned from the jungle about 5pm and the change out in the field caught every with surprise.

Steel girders are being used and the angle of the roof will let all the rain be collected and ran off into the pound aka Lake. The six support post are on solid ground and down about 18 inches and then concreted. More details at a latter date. Now where do I put the beer chest.:rolleyes::D As soon as the roof is completed our sparky will come back in and complete the power hookup then PEA will install the meter.

20190701_165428.jpg
20190701_165428.jpg 20190701_165531.jpg 20190701_165753.jpg
 

Attachments

  • 20190701_165710.jpg
    20190701_165710.jpg
    1.6 MB · Views: 0
After many of trips to the PEA office in KC...SWMBO has as she calls it her neon meter. She now has power to her cabin and lake site. Top meter its hers and the bottom meter is for the Swine Flu project.