gotlost
Kap Chong R Us Member
This from SurinCityTalk. Looks like major upgrade on the 226 from Ubon to Nakhon Sawan is in the mill.
What I have seen the road work on the 24 ends about 5 km east of Prasat with no sign of any upgrade from that point to Ubon. All equipment and effort is being shifted to the 214 from Prasat to down to Chong Chom.
What I have seen the road work on the 24 ends about 5 km east of Prasat with no sign of any upgrade from that point to Ubon. All equipment and effort is being shifted to the 214 from Prasat to down to Chong Chom.