And here is a little tip for Alan:

[FONT=&quot]Pile Driving.......Pakistani technique

For those with manpower, but not machinery available to them, here’s a construction technique that would be handy to know. Read the calculations below then click on the link at the bottom of the article to see this technique in action.

Something to cheer up an engineer. Notice that the pile driving becomes effective when the extra man jumps on.

Now, let's analyze the engineering here:
6 men x 180 lbs = 1080 lbs static force.
Jumping up and down will create a 3 times dynamic effect = 3240 lbs/jump = 1.6 ton thumps if the pile is tapered to 2 in x 2 in, cross section at the tip = 4 sq. In.
So, dynamic pressure/thump at pile tip = 3240/4 = 800 psi.
"Add a man" feature will increase to 950 psi, so buy the option!
Increase the chant and dynamic force goes up to 5 times to bring max pressure/thump to 1600 psi for a 7 man team. Quite good, and will penetrate clay and sandy soil, but not hard rock.

The foreman is the guy on the tambourine.

[/FONT][FONT=&quot][YT]nocookie.com/embed/cFb0nLCKypg?rel=0[/YT]