Well it's install almost....They mounted the panels, wired everything up to house with battery. But the other two buildings are not installed. I have two main wires, one from the house and one from guest house/garage to the meter. They did not come and do a site survey their engineers did all by google and seen there were 3 buildings and asked about how many AC units and EV charger. Well now they have to connect the other 2 buildings to the main house. First stating saying well they only do 1 meter, we said OK it is 1 meter just 2 separate lines If they would have done a site survey they would have seen that So a comprise was met, we pay for the extra wire and supplies and they will do the work.