I decided not participate in the sell back scheme due to the restrictions on what components you can use and the purchasing rate of 1.68 baht per kilowatt-hour
https://www.bangkokpost.com/business/1706534/solar-rooftop-revisions-soon
PEA could not have been more unhelpful if they tried:
First visit (6 months before planned installation) at the big PEA office out of town. “The guy who knows about solar is not here, come back tomorrow”
Second visit “if you don’t want to sell back to PEA, you don’t need permission”
Third visit before placing order - see second visit.
Fourth visit after placing order to arrange replacement of temporary meter (All the Thais told me not to mention solar - which I ignored) “you cannot have solar unless all the components are on the approved list” I told them, I didn’t want to sell back to PEA, “doesn’t matter” show me where on your website it says that. He couldn’t find it, but he showed me some printed papers, which seemed to be about the sell back scheme. He then said if I wanted solar, I couldn’t connect to PEA as I would turn the meter back, which was illegal. I told him that my system of an Off Grid Hybrid system and I was only using PEA as a backup and inverter could not send power out to PEA. I took his number and arranged for the installation company to call him and talk in Thai.
Fifth visit. He now said as my system was over 10kw I could not connect to PEA (another requirement of the sell back scheme) He said that they would not change my meter from a temporary meter until the big team came from Korat to check my system.
A few days later they came to change my meter, no sign of the boys from Korat.