Unfortunately it's full already and they dumping water to stop it overflowing
"Surin irrigation project starts draining water through the tub drainage door pratū Huai Shang. Open 5 cm. Total of 2 channels is 7 hundred thousand per day. m. To reduce the reservoir amount after water flowing to capacity..
Which is now a 26.337 minus amount of water. m. It's up to 119.92 % and there's rain over the tub x̀āng Huai Sanong now and Chao. Surin has sent officers to follow the drainage at the rear of the tub x̀āng to Lamchi.. to control the drainage from overflowing water. Let's follow the coverage of Chao Po. Continue to Surin
The director. Cho Po. Surin"
https://www.facebook.com/khaosurin/posts/2913433768943098